Molyhil Tungsten Project, NT

Tivan Limited (TVN) | Scoping Study | Released 29 Apr 2026

Mine life
9 years
Operations LOM; open pit ~7 years
Strip ratio
5.7:1
Waste:ore, open pit LOM average
NPV
$355.0 million
Post-tax, 8% real
Capex
A$187.3 million
Pre-production, incl. 25% contingency

Inferred share: Inferred 23.5% of schedule, 14.2% of open pit

Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.

Planning inputs

Inferred 23.5% of schedule, 14.2% of open pit | Slope angles not disclosed | Owner-operator mining | Mine plan by SRK Consulting | Four cutbacks after pre-strip

Also in the release

0.26% WO₃ and 0.09% Mo LOM at 530 ktpa; underground follows from July 2035. C1 A$151 per mtu, AISC A$238 per mtu, net of Mo credits. Cautionary statement gives capex as $187.4 million.

Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.