Mt Mulgine Tungsten Project, WA
Tungsten Mining NL (TGN) | Pre-Feasibility Study and updated Ore Reserve | Released 1 Sep 2026
Inferred share: Inferred 13% of mill feed
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred 13% of mill feed | Batter 50° to 60°, inter-ramp 40° to 48° at Trench | Dilution 5%, mining loss 5% | Contractor mining, owner-operated later | Ore Reserve by Snowden Optiro
Also in the release
WO3 grade 0.11% at 8 Mtpa, WO3 recovery 70%. AISC US$127 per WO3 mtu net of by-products. Post-tax NPV at 8% A$4,796M. Expansion case to 16 Mtpa: total capital A$1,290M.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- SKYTallebung Project, NSW | PFS | 10 Aug 2026
- TVNMolyhil Tungsten Project, NT | Scoping | 29 Apr 2026
- BCNLady Ida Project (Iguana Deposit), WA | PFS | 20 Aug 2026
- VTMNorth Stanmore Heavy Rare Earth Project, WA | PFS | 18 Aug 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.