Flemington Scandium Project, NSW

Australian Mines Limited (AUZ) | Scoping Study (amended announcement) | Released 8 May 2026

Mine life
28 years
LOM
Strip ratio
1.9:1
Indicative LOM, waste to ore
NPV
US$270 million
Post-tax, 8%, US$1,500/kg design price
Capex
US$125 million
Initial capital, pre-production

Inferred share: Inferred 0.6% of production target

Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.

Planning inputs

Inferred 0.6% of production target | Overall slope ~30° | Dilution 5%, ore loss 5% | Contractor mining | Mine plan by SRK Consulting | Three pits, 450ppm Sc cut-off

Also in the release

Feed grade 573ppm Sc over the first 15 years, ~72–76ktpa feed, 90.8% Sc recovery. C1 cash cost US$561/kg Sc₂O₃. Post-tax NPV8 ~US$860 million at the US$3,000/kg sensitivity case.

Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.

Similar studies

Browse the tracker

Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.