Sky Metals Limited (SKY) | Pre-Feasibility Study | Released 10 Aug 2026
Inferred share: Inferred ~34%
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred ~34% | Slope angles not disclosed | Dilution 10%; mining recovery not disclosed | Contract mining | Mine schedule by AMDAD; geotechnical design by Resolve Mining Solutions
Also in the release
Head grade 922 ppm Sn, 202 ppm WO3 and 7.34 g/t Ag at 3.0 Mtpa. AISC US$5,653/t tin (net of co-products). Post-tax NPV A$309.28 million at 8% real. No Ore Reserve declared.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- TGNMt Mulgine Tungsten Project, WA | PFS | 1 Sep 2026
- MKRWonawinta Silver and Mt Boppy Gold Mines (Cobar Basin), NSW | PFS | 23 Mar 2026
- SVYThursday's Gossan (Stavely Project), Vic | Scoping | 10 Aug 2026
- SVLBowdens Silver Project, NSW | DFS | 21 Jul 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.