Back to the study tracker

Abercromby Gold Project, WA

WA Gold Limited (WAU) | Scoping Study (Stage 1 Mine) | Released 22 Apr 2026

Mine life
4.5 years
Mining duration, OP and UG
Strip ratio
Not disclosed
Not disclosed
NPV
A$205 – A$253 million
Pre-tax, 7%, OP and UG
Capex
A$8m
Pre-production, OP and UG

Inferred share: Inferred ~10% of production target

Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.

Planning inputs

Inferred ~10% of production target | Overall wall angles 35° (open pit, first-pass optimisation) | Contractor mining | Mine plan by Intermine Engineering Consultants

Also in the release

Open pit (497kt at 1.64 g/t Au) then underground (1,160kt at 2.60 g/t Au), toll treated at 94% recovery. AISC A$4,204/oz open pit, A$2,938/oz underground. Table 1 NPV A$229m.

Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.

Similar studies

Browse the tracker

Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.