Syerston Scandium Project, NSW
Sunrise Energy Metals Limited (SRL) | Feasibility Study | Released 3 Mar 2026
Inferred share: Reserve-based, no Inferred
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Reserve-based, no Inferred | Overall slope angle 49° in pit optimisation | Dilution and mining losses included in resource model | Contract mining | Mine design and Ore Reserve by Mining One
Also in the release
64,000 tonnes of ore per year at 656 ppm scandium (life of mine), 88% processing recovery. C1 cost US$534/kg Sc2O3. NPV8% US$890m, IRR 76% at a US$3,000/kg price assumed for sensitivity; tax basis not disclosed.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- AUZFlemington Scandium Project, NSW | Scoping | 8 May 2026
- IVRParis Silver Project, SA | DFS | 27 Feb 2026
- TVNSpeewah Fluorite Project, WA | DFS | 20 Mar 2026
- ATRDonald Rare Earth and Mineral Sands Project (Phase 1), Vic | DFS | 31 Mar 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.