Paris Silver Project, SA
Investigator Silver Limited (IVR) | Definitive Feasibility Study and maiden Ore Reserve | Released 27 Feb 2026
Inferred share: Inferred 14% of production target
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred 14% of production target | Max inter-ramp ~34-42° soil, ~42° metasediments, ~47° dolomite; batter face ~50-65°, ~65°, ~75° | Dilution and ore loss within MIK model | Contract mining
Also in the release
Head grade 91 g/t Ag, 78% silver recovery, 1.5 Mtpa plant. AISC A$39.70/oz. Post-tax NPV8 A$832m (spot); consensus case (US$60.18/oz) pre-tax NPV8 A$618m.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- SVLBowdens Silver Project, NSW | DFS | 21 Jul 2026
- CODElizabeth Creek Copper-Silver Project, SA | Study update | 10 Mar 2026
- SHNLiontown Gold Operation, Qld | Scoping | 16 Feb 2026
- MKRWonawinta Silver and Mt Boppy Gold Mines (Cobar Basin), NSW | PFS | 23 Mar 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.