Donald Rare Earth and Mineral Sands Project (Phase 1), Vic
Astron Limited (ATR) | Bankable Feasibility Study (Phase 1) | Released 31 Mar 2026
Inferred share: Not disclosed
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred share not disclosed | Slope angles not disclosed | Contractor mining, two contractors shortlisted | Ore Reserve by AMC Consultants | Strip mining in sequential blocks
Also in the release
Average ore grade 4.5% at 7.5 Mtpa, dozer push to an in-pit MUP. Operating cash costs A$143.0m a year on average. Post-tax NPV8 A$462 million. FID targeted for Q2 2026.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- HASYangibana Rare Earths and Niobium Project, WA | DFS | 13 Jul 2026
- VHMGoschen Project, Vic | DFS | 21 Sep 2026
- ATRDonald Rare Earth and Mineral Sands Project, Phase 2 (RL2002), Vic | Study update | 9 Jun 2026
- AR3Koppamurra Rare Earths Project, SA | PFS | 25 Jun 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.