Lindfield Vanadium Project, Qld
Critical Minerals Group Limited (CMG) | Technical and Financial Pre-Feasibility Study | Released 20 Jul 2026
Inferred share: Inferred 6% of production target
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred 6% of production target | Batters 37° to base of weathering | Dilution 7.5%, loss 7.5% | Mine plan in-house | Strip ratio cut-off 3:1 | Two working faces
Also in the release
95 Mt at 0.41% V2O5 at 3 Mtpa ROM feed; process plant recovery 74.5%. V2O5 production cost ~US$5.90 -8.70/lb (first 25 years). NPV and capex cover mine and VE facility: Phase 1 AUD$47.5M, Phase 2 mine AUD$934M.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- ACPMedcalf Project, WA | PFS | 30 Jan 2026
- CMMMount Gibson Gold Project, WA | PFS | 27 Jul 2026
- HVYPort Gregory Garnet Project, WA | PFS | 29 Jul 2026
- MI6Bullabulling Gold Project, WA | PFS | 8 Jul 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.