Boab Metals Limited (BML) | Project delivery plan and Ore Reserve update | Released 29 Sep 2026

Mine life
10.5 years
Mine life, base case
Strip ratio
7.5
Waste:ore t:t, production target
NPV
A$1.06 billion
Pre-tax, 8%, base case
Capex
A$262 million
Total project capex

Inferred share: Inferred 16%

Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.

Planning inputs

Inferred 16% | Inter-ramp 23.2° to 57.9°, batter 30° to 80° by material | NSR cut-off A$40 | Ore Reserve by ERM; geotechnical design by Entech

Also in the release

Post-tax NPV8 of A$330 million on the Ore Reserve alone. A$205 million of capex remains. C1 cash cost US$2.8/oz payable Ag. Construction is under way.

Read the release on the company's siteSee it in The Study Sheet, October 2026

Similar studies

Browse the tracker

Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.