Jervois Copper-Silver-Gold Project, NT
KGL Resources Limited (KGL) | Baseline Economic Model (supplement to FSU25) | Released 24 Apr 2026
Inferred share: Inferred 12.8% of production target
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred 12.8% of production target | Slope angles not disclosed | Contractor mining | Open pit mine plan and schedule by Xenith Consulting | Reward, Reward NE, Bellbird, Bellbird North pits
Also in the release
Supplement to the FSU25. Open pit ore 1.34% Cu, then underground ore, to a 2Mtpa plant. C1 cost US$1.65/lb (net of by-product), AISC US$2.51/lb. Pre-tax NPV8 A$1,226 million.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- CVRCrawford Gold Project, WA | Study update | 15 Apr 2026
- CODElizabeth Creek Copper-Silver Project, SA | Study update | 10 Mar 2026
- ANXWhim Creek Copper Project, WA | Study update | 24 Feb 2026
- BMLSorby Hills, WA | Study update | 29 Sep 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.