Mt Carrington Project, NSW

Legacy Minerals Holdings Limited (LGM) | Scoping Study (amended) | Released 12 May 2026

Mine life
12 years
Mine life from first ore
Strip ratio
3.72:1
Waste to plant feed
NPV
A$514M
Pre-tax, 7%, Spot Case
Capex
A$220.5M
Initial, incl. EPCM and contingency

Inferred share: Inferred 29% of LOM production target

Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.

Planning inputs

Inferred 29% of LOM production target | Overall: oxide 35°, transitional 39°, fresh rock 45° (analogue) | Contract mining | Mine plan by Mining Plus | Eight pits

Also in the release

1 Mtpa cyanide-free flotation plant; head grade 0.97 g/t Au, 20.84 g/t Ag. AISC A$1,188/oz Au (Spot Case). Post-tax NPV7 A$322M (Spot Case); pre-tax NPV7 A$382M at Base Case.

Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.

Similar studies

Browse the tracker

Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.