Mt Carrington Project, NSW
Legacy Minerals Holdings Limited (LGM) | Scoping Study (amended) | Released 12 May 2026
Inferred share: Inferred 29% of LOM production target
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred 29% of LOM production target | Overall: oxide 35°, transitional 39°, fresh rock 45° (analogue) | Contract mining | Mine plan by Mining Plus | Eight pits
Also in the release
1 Mtpa cyanide-free flotation plant; head grade 0.97 g/t Au, 20.84 g/t Ag. AISC A$1,188/oz Au (Spot Case). Post-tax NPV7 A$322M (Spot Case); pre-tax NPV7 A$382M at Base Case.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- PRXHyperion Gold Deposit, Tanami North, NT | Scoping | 27 May 2026
- WAUAbercromby Gold Project, WA | Scoping | 22 Apr 2026
- NMTIronclad, Barrambie Gold Project, WA | Scoping | 19 Mar 2026
- ODYTuckanarra Gold Project, WA | Scoping | 9 Jul 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.