Gold Duke Project, WA
Western Gold Resources Limited (WGR) | Expanded scoping study | Released 17 Sep 2026
Mine life
21 months
Mining; processing 23 months
Strip ratio
13.3 : 1
Waste bcm : ore bcm
NPV
A$46.1 million
Post-tax, 8%
Capex
A$5.2 to A$5.4 million
Pre-mining capital and start-up
Inferred share: Inferred 18%
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred 18% | Slope angles not disclosed | Dilution 10 to 15%, mining recovery 95% | Contractor mining | Mine plan by Minecomp
Also in the release
Production target 1.11Mt at 1.7 g/t Au with 93% recovery, toll treated at the Wiluna plant 46km away. Operating cash cost ~A$4,650 per recovered ounce.
Read the release on the company's siteSee it in The Study Sheet, October 2026
Similar studies
- SHNLiontown, Qld | Scoping | 21 Sep 2026
- TG6Van Uden Gold Project, WA | Scoping | 29 Sep 2026
- SVYThursday's Gossan (Stavely Project), Vic | Scoping | 10 Aug 2026
- ODYTuckanarra Gold Project, WA | Scoping | 9 Jul 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.