Gold Duke Project, WA

Western Gold Resources Limited (WGR) | Expanded scoping study | Released 17 Sep 2026

Mine life
21 months
Mining; processing 23 months
Strip ratio
13.3 : 1
Waste bcm : ore bcm
NPV
A$46.1 million
Post-tax, 8%
Capex
A$5.2 to A$5.4 million
Pre-mining capital and start-up

Inferred share: Inferred 18%

Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.

Planning inputs

Inferred 18% | Slope angles not disclosed | Dilution 10 to 15%, mining recovery 95% | Contractor mining | Mine plan by Minecomp

Also in the release

Production target 1.11Mt at 1.7 g/t Au with 93% recovery, toll treated at the Wiluna plant 46km away. Operating cash cost ~A$4,650 per recovered ounce.

Read the release on the company's siteSee it in The Study Sheet, October 2026

Similar studies

Browse the tracker

Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.