Ironclad, Barrambie Gold Project, WA

Neometals Ltd (NMT) | Scoping study | Released 19 Mar 2026

Mine life
Within ~12 months
Mining duration
Strip ratio
14:1
Waste to ore, tonnes
NPV
Not disclosed
Undiscounted cashflow only
Capex
~AU$2M
Upfront, BMLV estimate, outside study

Inferred share: Inferred 18% of production target

Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.

Planning inputs

Inferred 18% of production target | 40° overall in optimisation | Dilution 10%, mining recovery ~87% | Mining by BMLV under proposed JV | Geotechnical parameters by Peter O'Bryan & Associates

Also in the release

200 to 220 kt at 1.8 g/t Au, toll milled ~255 km away at 90% recovery (85% case also run). Study excludes capital costs; undiscounted pre-tax operating cashflow AU$23M.

Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.