Bowdens Silver Project, NSW
Silver Mines Limited (SVL) | Definitive Feasibility Study and updated Ore Reserve | Released 21 Jul 2026
Inferred share: Inferred 0.6% of LOM production target
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred 0.6% of LOM production target | Slope angle 50° to 54°, batter 55° to 70°, by domain | No further dilution or ore loss applied, mining recovery 100% | Owner operator mining
Also in the release
Ore Reserve 47.9Mt at 60.8 g/t Ag; 2.0 Mtpa at 82.1% LOM silver recovery. AISC A$32.91/oz. DFS Stage 1 alone: 16.75 years, strip 1.47, pre-tax NPV A$877m. Stage 2 tailings landform is at pre-feasibility level.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- IVRParis Silver Project, SA | DFS | 27 Feb 2026
- SKYTallebung Project, NSW | PFS | 10 Aug 2026
- SVYThursday's Gossan (Stavely Project), Vic | Scoping | 10 Aug 2026
- SHNLiontown, Qld | Scoping | 21 Sep 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.