Pilgangoora Operation, WA
PLS Group Limited (PLS) | Feasibility Study and Ore Reserve update | Released 16 Oct 2026
Inferred share: Reserve-based, no Inferred
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Reserve-based, no Inferred | Batter face 60° to 85° in fresh rock, 60° to 65° weathered | Dilution 27%, ore loss 7% | Mine plan in-house
Also in the release
Open Pit Ore Reserve 194.2Mt at 1.19% Li2O. New 6.3Mtpa wet plant, recovery ~70%. Unit operating costs (FOB) ~A$620/t real, first 10 years. FID taken; first production September Quarter CY29.
Read the release on the company's siteSee it in The Study Sheet, November 2026
Similar studies
- GL1Manna Lithium Project, WA | Study update | 16 Sep 2026
- WC8Tabba Tabba Project, WA | DFS | 26 Oct 2026
- BMLSorby Hills, WA | Study update | 29 Sep 2026
- ATRDonald Rare Earth and Mineral Sands Project, Phase 2 (RL2002), Vic | Study update | 9 Jun 2026
Browse the tracker
Cognomine can solve a block model and return a practical plan in minutes.