Tabba Tabba Project, WA

Wildcat Resources Limited (WC8) | Definitive Feasibility Study and updated Ore Reserve | Released 26 Oct 2026

Mine life
11.5 years
Mining and processing; LOM 15.0 years
Strip ratio
8:1
Life of mine, waste to ore
NPV
~A$1.5 billion
Post-tax, NPV8, SC6 US$1,500/t
Capex
A$774 million
Pre-production, incl. contingency

Inferred share: Reserve-based, no Inferred

Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.

Planning inputs

Reserve-based, no Inferred | Batter 60° oxide, 80° fresh | Open pit dilution 2.6%, ore loss 1.9% | Contract mining | Mine design, geotechnical and Reserves by AMC

Also in the release

Probable Ore Reserve 48.3Mt at 0.97% Li2O, 79% open pit (Leia). Plant 2.25Mtpa rising to 4.5Mtpa, SC5.5 at 74.0% recovery. AISC US$709/t.

Read the release on the company's siteSee it in The Study Sheet, November 2026