Astron Limited (ATR) | Revised Phase 2 Economic Study and RL2002 Ore Reserves Update | Released 9 Jun 2026
Inferred share: Reserve-based, no Inferred
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Reserve-based, no Inferred | Overall wall angle 20.0 degrees | No mining dilution applied, ore loss 6.0% | Contractor mining | Ore Reserve and mine planning by AMC Consultants
Also in the release
Dozer push strip mining to an in-pit MUP. Both phases: ROM ore throughput of 15.0Mtpa, average ore grade 4.6%, pre-tax NPV8 $2.3 billion, IRR 25.6%. RL2002 Ore Reserve 435Mt at 4.7% heavy mineral grade.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- AR3Koppamurra Rare Earths Project, SA | PFS | 25 Jun 2026
- HASYangibana Rare Earths and Niobium Project, WA | DFS | 13 Jul 2026
- ATRDonald Rare Earth and Mineral Sands Project (Phase 1), Vic | DFS | 31 Mar 2026