Whim Creek Copper Project, WA
Anax Metals Limited (ANX) | Definitive Feasibility Study update | Released 24 Feb 2026
Inferred share: Inferred 6% of production target
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred 6% of production target | Slope angles not disclosed | Contractor mining | Open pit mining costs updated by Orelogy; 2023 open pit Ore Reserve by Orelogy
Also in the release
No new open pit optimisations, designs or schedules since the 2023 DFS. Reserve 4.6 Mt at 1.36% Cu feeds a 400Kt per annum concentrator. AISC US$1.61/lb of copper, net of by-products.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- CODElizabeth Creek Copper-Silver Project, SA | Study update | 10 Mar 2026
- KGLJervois Copper-Silver-Gold Project, NT | Study update | 24 Apr 2026
- CNBGreater Duchess Copper Gold Project, Qld | PFS | 16 Mar 2026
- SVYThursday's Gossan (Stavely Project), Vic | Scoping | 10 Aug 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.