Greater Duchess Copper Gold Project, Qld
Carnaby Resources Limited (CNB) | Pre-Feasibility Study and Maiden Ore Reserve | Released 16 Mar 2026
Inferred share: Inferred 9% of production target
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred 9% of production target | Batter face 80° in fresh rock; overall 47° to 58° | Dilution 4% to 23%, ore loss 4% to 12% | Carnaby operates the fleet under MARC | Mine plan by SRK
Also in the release
Six open pits, then underground at Mount Hope Central and Nil Desperandum; ore toll treated at Mount Isa under Glencore agreements. Target 9.3Mt @ 1.9% CuEq. AISC A$9,583/t payable Cu.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- MKRWonawinta Silver and Mt Boppy Gold Mines (Cobar Basin), NSW | PFS | 23 Mar 2026
- RRLMcPhillamys Gold Project, NSW | PFS | 19 Jun 2026
- MI6Bullabulling Gold Project, WA | PFS | 8 Jul 2026
- CMMMount Gibson Gold Project, WA | PFS | 27 Jul 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.