See Cognomine on a pre-solved synthetic model
A click-through of the inputs Cognomine needs and the outputs it returns on a strategic, long-term or medium-term plan: block model upload, constraints and objectives, 3D schedule with digger paths and progress, NPV and cashflow, constraint diagnostics, and side-by-side scenario comparison. Book a call and we will walk you through it on a scenario close to your own.

Block model, assumptions, constraints and objectives
Upload a block model, pit shells, and the economic and physical assumptions that drive the plan. Then set mining, processing, and market constraints alongside your objectives: NPV, cost profile, production rate, capital sequencing, or a custom combination. The inputs are the same CSV-style exports you already work with, so nothing has to be re-modelled to get started.

3D schedule view
Play the schedule back in three dimensions, month by month, and watch phases open in sequence. It is block-level, not aggregated, so the picture matches the numbers underneath. Follow each digger through its territory: which blocks, in what order, and how the face advances. Territories and walk order come out of the solve, not from a layer drawn on afterwards.

NPV and cashflow
Per-scenario NPV, undiscounted cashflow, revenue, opex and capex. Every number is traceable back to the scheduled blocks and the input assumptions.

Constraint diagnostics
See which constraints are holding and where they bind. Bench sequencing, dig precedence, haulage and processing capacity, stockpile strategy, capital and operating limits, all reported per run.
Ready to see it on your scenario?
Book a 30-minute call and we will run through Cognomine on a scenario close to yours.
