Hawsons Iron Project, NSW
Hawsons Iron Ltd (HIO) | PFS Update May 2026 | Released 26 May 2026
Inferred share: Reserve-based, no Inferred; separate larger-pit schedule 25% Inferred
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Reserve-based, no Inferred; separate larger-pit schedule 25% Inferred | Geotechnical design by PSM | Dilution skin 5m | Owner mining, contractor explosives | Mine plan by AMDAD
Also in the release
Up to 12Mtpa of +68% Fe magnetite concentrate from ore at 11.6% DTR average head grade. C1 cost $US 44.20/dmt; Phase 1 capital $AU 3.88B. Mine plan unchanged from the December 2025 PFS.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- VRXArrowsmith North Silica Sand Project, WA | Study update | 27 May 2026
- ATRDonald Rare Earth and Mineral Sands Project, Phase 2 (RL2002), Vic | Study update | 9 Jun 2026
- KGLJervois Copper-Silver-Gold Project, NT | Study update | 24 Apr 2026
- CVRCrawford Gold Project, WA | Study update | 15 Apr 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.