Yangibana Rare Earths and Niobium Project, WA
Hastings Technology Metals Ltd (HAS) | Updated Definitive Feasibility Study (DFS) for Stage 1 | Released 13 Jul 2026
Inferred share: Reserve-based, no Inferred
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Reserve-based, no Inferred | Geotechnical design by Snowden and 3rd Rock Consulting | Ore loss 2%, no additional dilution | Owner-operator mining | Mine plan by Resolve Mining Solutions
Also in the release
ROM grade 1.07% TREO (Years 1-16) to a 1.2 Mtpa flotation plant at 85.7% TREO recovery. C1 A$20.75/kg TREO. AISC A$25.57/kg TREO in highlights, A$24.57/kg TREO in the results table. Mining fleet leased, outside capex.
Read the release on the company's siteAdded to the tracker; released before the first issue of The Study Sheet.
Similar studies
- VHMGoschen Project, Vic | DFS | 21 Sep 2026
- ATRDonald Rare Earth and Mineral Sands Project (Phase 1), Vic | DFS | 31 Mar 2026
- AR3Koppamurra Rare Earths Project, SA | PFS | 25 Jun 2026
- ATRDonald Rare Earth and Mineral Sands Project, Phase 2 (RL2002), Vic | Study update | 9 Jun 2026
Browse the tracker
Published by Cognomine. Cognomine can solve a block model and return a practical plan in minutes.