Sandy Mitchell Rare Earths and Heavy Minerals Project, Qld
Ark Mines Limited (AHK) | Scoping Study Update | Released 29 Oct 2026
Mine life
~26 years
Operating; mining 24 years + part year
Strip ratio
Not disclosed
Free-dig with minimal waste
NPV
A$883M
Post-tax, 8%, after equipment finance
Capex
A$383.6M
Pre-production, incl. 25% contingency
Inferred share: Inferred 3% of production target
Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.
Planning inputs
Inferred 3% of production target | Slope angles not disclosed | Scoping Study by MEC Mining | Dozer push to two mobile mining units
Also in the release
13.0 Mtpa at 5,204 ppm MzEq average head grade. Site operating cost A$8.31/t ore. No Ore Reserve has been estimated; PFS and JORC Ore Reserve to commence immediately.
Read the release on the company's siteSee it in The Study Sheet, November 2026
Similar studies
- CRIJupiter Rare Earth Elements Project, WA | Scoping | 20 Oct 2026
- VHMGoschen Project, Vic | DFS | 21 Sep 2026
- VTMNorth Stanmore Heavy Rare Earth Project, WA | PFS | 18 Aug 2026
- HASYangibana Rare Earths and Niobium Project, WA | DFS | 13 Jul 2026
Browse the tracker
Cognomine can solve a block model and return a practical plan in minutes.