Sandy Mitchell Rare Earths and Heavy Minerals Project, Qld

Ark Mines Limited (AHK) | Scoping Study Update | Released 29 Oct 2026

Mine life
~26 years
Operating; mining 24 years + part year
Strip ratio
Not disclosed
Free-dig with minimal waste
NPV
A$883M
Post-tax, 8%, after equipment finance
Capex
A$383.6M
Pre-production, incl. 25% contingency

Inferred share: Inferred 3% of production target

Figures are as the company states them, in its currency and on its basis. "Not disclosed" means the release doesn't state the figure.

Planning inputs

Inferred 3% of production target | Slope angles not disclosed | Scoping Study by MEC Mining | Dozer push to two mobile mining units

Also in the release

13.0 Mtpa at 5,204 ppm MzEq average head grade. Site operating cost A$8.31/t ore. No Ore Reserve has been estimated; PFS and JORC Ore Reserve to commence immediately.

Read the release on the company's siteSee it in The Study Sheet, November 2026